Explore a fire-tube steam boiler and its ancillary equipment. Click any hotspot to reveal heat losses and discover how Inzonex modular insulation delivers measurable savings.
| Equipment | Before (°C) | After (°C) | Annual Saving | Install Time |
|---|---|---|---|---|
| Safety Valves (2) | +180°C | 45°C | EUR 890 | 15 min |
| Steam Stop Valve | +180°C | 45°C | EUR 870 | 20 min |
| Backside of Boiler | +135°C | 45°C | EUR 8,670 | 30 min |
| CR Pump / Feedwater (2) | +95°C | 45°C | EUR 540 | 25 min |
| Steam Header Flanges (2) | +180°C | 45°C | EUR 320 | 20 min |
| Blowdown / Ball Valves (4) | +95°C | 45°C | EUR 260 | 10 min |
| Manhole (3) | +145°C | 45°C | EUR 630 | 15 min |
| Boiler Door (front) | +135°C | 45°C | EUR 6,390 | 10 min |
| Boiler Metal Frame (6) | +123°C | 45°C | EUR 1,380 | 5 min |
| Total (9 components) | EUR 19,950 | ~3.5 hrs |
Our engineers will survey your boiler room at no cost and deliver a detailed feasibility study with projected ROI within 10 business days.
Book a Free Thermal Assessment