Inzonex

Interactive Boiler Room

Explore a fire-tube steam boiler and its ancillary equipment. Click any hotspot to reveal heat losses and discover how Inzonex modular insulation delivers measurable savings.

BEFORE INSULATION
Before
After
Number of boilers: 1
Operating hours: 8,500 hrs/yr
Energy cost: EUR 50/MWh
Click hotspot for details
High temperature (uninsulated)
Safe temperature (with Inzonex)
Fire-Tube Steam Boiler System — Side View (10 t/h, 10 bar)
CONDENSATE RETURN INZONEX 10 bar / 184°C 10 t/h steam GAS EXHAUST STEAM OUT 16 12 8 4 0 bar 10.2 bar FEEDWATER BLOWDOWN 5.5 kW FEEDWATER PUMP SAFETY VALVES +180°C STEAM VALVE +180°C BACKSIDE +135°C CR PUMP +95°C HEADER FLANGES +180°C BLOWDOWN +95°C MANHOLE +145°C FRONT DOOR +135°C METAL FRAME +123°C
Annual Impact Summary
0
Annual Heat Loss
Without insulation (EUR/year)
0
Annual Savings
With Inzonex insulation (EUR/year)
0
Payback Period
Months to return on investment
0
CO2 Reduction
Tonnes per year avoided
Equipment Breakdown
Equipment Before (°C) After (°C) Annual Saving Install Time
Safety Valves (2)+180°C45°CEUR 89015 min
Steam Stop Valve+180°C45°CEUR 87020 min
Backside of Boiler+135°C45°CEUR 8,67030 min
CR Pump / Feedwater (2)+95°C45°CEUR 54025 min
Steam Header Flanges (2)+180°C45°CEUR 32020 min
Blowdown / Ball Valves (4)+95°C45°CEUR 26010 min
Manhole (3)+145°C45°CEUR 63015 min
Boiler Door (front)+135°C45°CEUR 6,39010 min
Boiler Metal Frame (6)+123°C45°CEUR 1,3805 min
Total (9 components)EUR 19,950~3.5 hrs

See your own savings

Our engineers will survey your boiler room at no cost and deliver a detailed feasibility study with projected ROI within 10 business days.